Residential Construction

At Dalla Ruhe Engineering and Construction Company, we specialize in building durable, beautiful, and functional homes that perfectly reflect your lifestyle, needs, and long-term goals. From the ground up, we manage every stage of construction with precision, transparency, and a commitment to quality.

Our experienced team combines strong engineering expertise with craftsmanship, ensuring your home is built on solid foundations, finished to the highest standards, and delivered on time. Whether you’re building a modest starter home, a spacious family residence, or a luxury multi-story house, we walk with you every step of the way.


What Our Construction Service Includes

  • Site Preparation & Foundations – Excavation, setting out, and strong foundations for lasting stability.
  • Structural Works – Walls, slabs, beams, and roofing built with precision and safety in mind.
  • Utilities Installation – Electrical wiring, plumbing, and drainage systems integrated seamlessly.
  • Finishing Works – Flooring, tiling, painting, ceilings, and carpentry for a perfect finish.
  • Exterior Works – Driveways, landscaping, boundary walls, and outdoor spaces.
  • Quality Control & Supervision – Regular inspections to ensure compliance with design and safety standards.

How Our Construction Service Works

We prepare a detailed bill of quantities (BoQ) and cost estimate for all required materials plus transportation costs. Once you approve the budget, we can purchase the materials on your behalf, or you can purchase them independently.

We prefer you allow us to purchase the materials on your behalf to ensure:

  • Correct materials are bought at fair market prices – We use vetted suppliers and compare quotes so you get the right products (correct grade, spec, and warranty) at competitive rates. Bulk buying and supplier relationships often secure discounts you wouldn’t get shopping alone, and every purchase is documented with invoices for full transparency.
  • Time savings since you don’t have to run around suppliers – Our procurement team sources, negotiates, orders and coordinates deliveries for you. That saves you dozens of hours of trips and calls, speeds up the build schedule, and frees you to focus on decisions that matter most.
  • Reduced risk of delays due to missing or wrong materials – We plan deliveries to match the construction schedule, inspect materials on arrival, and keep buffer stocks for critical items. This prevents work stoppages caused by incorrect or late supplies and makes on-site progress more predictable and reliable.

However, if you prefer to purchase the materials yourself, we fully support that option. In such cases, we provide you with a detailed bill of quantities (BoQ) and guide you on what to buy and when, while we handle the construction and supervision.

Sample BOQ — 100 sqm, 3-bedroom bungalow (materials only)

Foundation
ItemQuantityUnit cost (KES)Transport (KES)Total (KES)
Cement (50 kg bags)220 bags90010,000208,000
Coarse aggregate (m³)30 m³2,2009,00075,000
River sand (m³)40 m³1,2008,00056,000
Hardcore / fill (m³)20 m³1,0004,20024,200
Reinforcement steel (kg)2,500 kg1600400,000
Binding wire (kg)50 kg15007,500
Foundation subtotal: KES 770,700
Walls
ItemQuantityUnit cost (KES)Transport (KES)Total (KES)
Hollow blocks (no.)3,000456,000141,000
Cement for blocklaying & plaster (50 kg bags)180 bags9007,550169,550
Sand for plaster (m³)25 m³1,2005,00035,000
Hoop iron reinforcement (kg)200 kg160032,000
Walls subtotal: KES 377,550
Roofing
ItemQuantityUnit cost (KES)Transport (KES)Total (KES)
Roofing sheets (corrugated) (no.)351,2003,50045,500
Timber for trusses (m³)3.025,0005,00080,000
Nails & fixings (lumpsum)115,0002,00017,000
Ceiling board (sqm)100 sqm1,0003,000103,000
Timber for ceiling battens (m³)0.525,0001,00013,500
Roofing subtotal: KES 259,000

Finishes (floors, tiles, paint)
ItemQuantityUnit cost (KES)Transport (KES)Total (KES)
Ceramic tiles (floor & wet areas) — sqm100 sqm1,2005,000125,000
Floor screed – cement (50 kg bags)40 bags9003,00039,000
Floor screed – sand (m³)6 m³1,2001,0008,200
Tile adhesive & grout (kg)100 kg2501,00026,000
Paint (5 L tins)8 tins2,5002,00022,000
Finishes subtotal: KES 220,200
Doors & Windows
ItemQuantityUnit cost (KES)Transport (KES)Total (KES)
Internal doors (no.)88,0002,00066,000
External main door (no.)115,0001,00016,000
Aluminium windows (no.)106,0002,00062,000
Glass (sqm)12 sqm2,00050024,500
Doors & Windows subtotal: KES 168,500
Electrical & Plumbing
ItemQuantityUnit cost (KES)Transport (KES)Total (KES)
Main electrical cable (roll)118,0001,00019,000
Lighting & power cable rolls (combined)3 rolls6,0001,00019,000
Conduits & fittings (lumpsum)120,0001,00021,000
Switches & sockets (no.)2080050016,500
Distribution board & MCBs (set)125,0001,00026,000
Light fittings (no.)102,00050020,500
PVC pipes & fittings (lumpsum)180,0003,00083,000
Sanitaryware set (no.)325,0002,00077,000
Electrical & Plumbing subtotal: KES 282,000
GRAND TOTAL (materials only): KES 2,077,950

Logistics fee per delivery

When you allow us to purchase materials on your behalf, we charge a small logistics fee per delivery, usually KES 5,000 – 10,000, in addition to the cost of materials and transportation.

This fee covers:

  • Time and oversight – Our team spends time sourcing, supervising loading/unloading, and ensuring materials are properly stored on site to prevent wastage or theft.
  • Supplier vetting and quality checks – We personally verify that the right materials are delivered, in the correct quantities and quality, before they are accepted on site.

By charging per delivery, you only pay for the actual logistics effort required. This model is transparent, flexible, and often cheaper than percentage-based fees.

Wherever possible, we group materials together into fewer trips, which reduces both transport costs and logistics fees.

Our priority is to keep your costs low, avoid unnecessary trips, and make sure every delivery contributes directly to steady progress on your home.

Labor and supervision fees

Having taken care of all materials, transportation costs, plus logistics fee, the only expense remaining is labor and supervision fees.

We charge a fixed daily rate for supervision and labor, taking into account who is on-site, what they do, and how long they’ll be there.

Every project is unique, meaning we can’t propose a general figure. This will be misleading. We can overcharge you and you end up spending more than is necessary. Or we can undercharge you and our company ends up making a loss. So, we analyze each project in great detail and give you a well-calculated amount for labor and supervision.

To help you understand our pricing better, below is an estimate for a 100 sqm 3-bedroom bungalow:

Sample Labor & Supervision Cost Schedule

(For illustration only – final rates depend on design, site conditions, and finishes)

Role / Worker TypeDaily Rate (KES)Estimated DaysEstimated Total (KES)Notes
Site Engineer5,00030 days (part-time across 4 months)150,000Visits site 2–3 times per week for supervision and quality checks
Site Supervisor (Foreman)3,00090 days (daily presence)270,000On-site every day to oversee work and report progress
Masons (4 workers)1,500 each = 6,00070 days420,000Build foundation, walls, plastering, and finishes
Carpenters (2 workers)1,500 each = 3,00030 days90,000Formwork, roof trusses, doors, and windows
Steel Fixers (2 workers)1,500 each = 3,00020 days60,000Reinforcement for foundation, beams, and slab
Plumbers (2 workers)1,500 each = 3,00015 days45,000Install piping, drainage, and fittings during finishing stage
Electricians (2 workers)1,500 each = 3,00015 days45,000Full house wiring, sockets, and lighting fixtures
Roofers (2 workers)1,500 each = 3,00015 days45,000Roofing structure, iron sheets/tiles installation
Painters (2 workers)1,500 each = 3,00020 days60,000Wall painting, finishes, polish
Tilers / Floor Finishers (2 workers)1,500 each = 3,00020 days60,000Tile laying for floors, walls, and bathrooms
General Laborers (6 workers)800 each = 4,80090 days432,000Carrying materials, mixing concrete, assisting tradesmen
Glaziers / Aluminum Fitters (optional, 2 workers)1,500 each = 3,00010 days30,000Glass windows, panes, and aluminum fittings if required

Estimated Total Labor & Supervision Fee: ~KES 1.7M

(For a 100 sqm 3-bedroom bungalow, excluding materials)


At Dalla Ruhe, we ensure every shilling is accounted for — no hidden costs, no surprises.